12Engineering & Infrastructure
Protect availability and performance after handover.
ANTA structures maintenance and operation around criticality, measurement, alarms, skills, spares and traceability.
A/01
Design principle
Data • Interfaces • Evidence
Common situations
Signals that justify a study.
- 01Assets handed over without an operating strategy
- 02Repeated failures and corrective-only maintenance
- 03Many alarms but no prioritisation
- 04Consumption and control drift
- 05Dependence on a supplier without documentation or reversibility
Scope of services
Assignments proportionate to the real need.
Preventive and corrective maintenance plans
Monitoring, remote supervision and alarm management
Consumption and performance tracking
Operating support and controls optimisation
Training, documentation, critical spares and reversibility
Assignment method
From observation to performance evidence.
Every stage produces a decision, document or control useful to the next.
List equipment and critical functions
Define service levels and responsibilities
Build task schedules and frequencies
Configure data, alarms and escalation
Organise spares, contracts and skills
Analyse drift and corrective action
Update records and improvement plans
Deliverables
Documents designed to decide, procure, control and operate.
The deliverable organises assumptions, interfaces, responsibilities and evidence.
Asset register and criticality matrix
Maintenance plan and task schedules
Alarm, role and escalation matrix
Dashboards and periodic reports
Operating file and procedures
Training and critical-spares plan
Continuous-improvement register
ANTA perspective
A clear technical position.
Performance lasts only when it is measured, understood, maintained and transferred to the people who operate the system.
Turn a subject into a project