08Engineering & Infrastructure

Sustainable buildings and envelope

Reduce demand at source through an envelope adapted to climate, use and existing assets.

Protect from climate. Use passive resources. Reduce active systems.

View all expertise
A/01
Design principle
Data • Interfaces • Evidence
How can the building itself become the first lever for comfort and sufficiency?
01Thermal and acoustic insulation
02External wall insulation
03Opaque envelope treatment
04High-performance windows
05Air and water tightness
06Solar control and bioclimatic design
01

Passive before active

Orientation, shading, inertia, ventilation, envelope and use are assessed before systems are sized.

02

Summer comfort

Reducing solar and internal gains lowers cooling demand and improves resilience during outages.

03

Controlled retrofit

Existing substrates, thermal bridges, moisture, fire, maintenance and appearance are all considered.

Assignment method

From observation to performance evidence.

The approach maintains continuity from diagnosis and design through delivery and operation.

01

Read site, orientation and uses

02

Diagnose envelope and defects

03

Simulate protection and improvements

04

Define details and interfaces

05

Inspect workmanship quality

Deliverables

Documents designed to decide, procure, control and operate.

A deliverable is not a formality: it organises assumptions, responsibilities, interfaces and required evidence.

DOC.01

Envelope, moisture and thermal bridge diagnosis

DOC.02

Bioclimatic and refurbishment scenarios

DOC.03

Construction details and material specifications

DOC.04

Air/watertightness, safety and finish control plan

Typical assignment — method illustration

Applied scenario

A response built around the real problem.

Situation
A building overheats, degrades and relies excessively on cooling.
ANTA response
Orientation, sun, walls, glazing, ventilation, moisture and uses are analysed before systems.
Expected outcome
More passive comfort, lower demand and better-protected assets.

This scenario illustrates a working method; it is neither a client reference nor a performance commitment without a study.

Turn a subject into a project

Share the available data. We will structure the next step.

Discuss your needs