Passive before active
Orientation, shading, inertia, ventilation, envelope and use are assessed before systems are sized.
Reduce demand at source through an envelope adapted to climate, use and existing assets.
Protect from climate. Use passive resources. Reduce active systems.
How can the building itself become the first lever for comfort and sufficiency?
Orientation, shading, inertia, ventilation, envelope and use are assessed before systems are sized.
Reducing solar and internal gains lowers cooling demand and improves resilience during outages.
Existing substrates, thermal bridges, moisture, fire, maintenance and appearance are all considered.
Assignment method
The approach maintains continuity from diagnosis and design through delivery and operation.
Deliverables
A deliverable is not a formality: it organises assumptions, responsibilities, interfaces and required evidence.
Applied scenario
This scenario illustrates a working method; it is neither a client reference nor a performance commitment without a study.
Turn a subject into a project