Commissioning: proving that systems work
23 juillet 2026
Completion is not performance
Installed and powered equipment may still be poorly set, uncoordinated or unable to deliver the required outcome.
Prepare the evidence
Criteria, test procedures, instruments, sequences, tolerances and responsibilities are defined before commissioning.
Transfer to operations
Commissioning organises settings, training, records, alarms and follow-up after acceptance.